Power system study
Main Issues that initiated the Study
With its numerous hotels, sports arenas and leisure centres, Lusail City, a new part of Doha, will be one of the most important and significant cities hosting the main stadium, teams, fans and audiences during the 2022 World Cup.
- Problems with developers’ requests for Building Permits due to not adequately allocated power per plots;
- Expectations of load increase due to reasons from 1.
- Concerns about cables’ and transformers’ capacity due to expected load increase.
Purpose of the Study Project Tasks
- To improve Design criteria keeping in mind latest international and regional standards and available local and regional electricity consumption data;
- To provide new power allocation based on revised Design Criteria;
- To create network model in appropriate software (PSS Sincal is selected due to its capability and also it is Kahramaa (Qatar General Electricity & Water Corporation) software tool for distribution network analysis and planning) and new loads which provides: analysis of network operation under modified circumstances, its redesign and future what-if analysis for any future changed circumstances;
- To redesign network corresponding to CP05A and CP06A plots where the biggest power allocation is expected due to Design Criteria revision.